{"id":3528,"date":"2024-07-10T09:48:57","date_gmt":"2024-07-10T02:48:57","guid":{"rendered":"https:\/\/portalutama.net\/index.php\/2024\/07\/10\/united-tractors-peroleh-sertifikasi-renewable-energy-dari-pln\/"},"modified":"2024-07-10T09:48:57","modified_gmt":"2024-07-10T02:48:57","slug":"united-tractors-peroleh-sertifikasi-renewable-energy-dari-pln","status":"publish","type":"post","link":"https:\/\/portalutama.net\/index.php\/2024\/07\/10\/united-tractors-peroleh-sertifikasi-renewable-energy-dari-pln\/","title":{"rendered":"United Tractors Peroleh Sertifikasi Renewable Energy dari PLN"},"content":{"rendered":"<p> <br \/>\n<\/p>\n<div itemprop=\"articleBody\">\n<!-- ARTICAL CONTENT --><\/p>\n<p><strong><a href=\"https:\/\/www.theiconomics.com\/?s=United+Tractors\">PT United Tractors Tbk<\/a><\/strong> (UT) telah berhasil mendapatkan <em>Renewable Energy Certificate <\/em>(REC) di sepanjang 2023 dari PT Perusahaan Listrik Negara (PLN) di 27 titik cabang dan <em>site <\/em>di seluruh Indonesia.<\/p>\n<p>Dari keseluruhan REC, UT dapat menurunkan <em>Greenhouse Gases <\/em>(GHG) <em>reduction <\/em>sebesar 5.109 tonCO2eq. REC yang diterima UT ini sejalan dengan salah satu strategi transisi korporasi di bidang energi dan sebagai langkah menuju <em>Net Zero Emission<\/em>.<\/p>\n<p>\u201cSalah satu strategi transisi korporasi di bidang energi, UT telah menetapkan bisnis Energi Baru Terbarukan (EBT) yang sejalan dengan strategi pengembangan usaha di sektor energi yang ramah lingkungan. Harapannya, inisiatif ini tidak hanya memberikan kontribusi positif terhadap keberlanjutan lingkungan, tetapi juga memberikan nilai tambah bagi pemangku kepentingan,\u201d ujar Head of Corporate Governance and Sustainability UT, Sara K. Loebis dalam keterangan resminya.<\/p>\n<p>Ada dua periode dalam penyerahan REC ini. Tahapan pertama dilakukan selama periode bulan Januari \u2013 Juni 2023 di 14 titik cabang dan satu <em>site <\/em>dengan total perolehan REC sebesar 4.169 unit. Titik tersebut tersebar di UT Cabang Surabaya, Balikpapan, Semarang, Manado, Makassar, Samarinda, Medan, Pekanbaru, Padang, Jayapura, Banjarmasin, Bandar Lampung, Jambi, Palembang, dan UT Site Tanjung Enim. Pada tahap ini, GHG <em>reduction <\/em>yang dapat UT turunkan sebesar 3.627 tonCO2eq dari keseluruhan unit REC.<\/p>\n<p>Pada periode Juli \u2013 Desember 2023 terdapat 2 cabang dan 10 <em>site <\/em>UT dengan total REC sebanyak 1.704 unit yang diperoleh. Area tersebut meliputi UT Cabang Pontianak dan Sorong, serta UT Site Muara Lawa, Tanjung redeb, Batulicin, Satui, Loa Janan Sanga, Tenggarong, Rantau, Tarakan, Sampit, dan Adaro Tanjung. Melalui tahap dua ini, UT dapat menurunkan GHG <em>reduction <\/em>sebesar 1.482 tonCO2eq.<\/p>\n<p>Harapannya, dengan diterimanya REC ini, UT dapat menggunakan energi listrik secara bijak yang bersumber dari energi terbarukan, serta membantu PLN dalam meningkatkan proporsi energi bersih di Indonesia. Selain itu, REC juga diharapkan mampu mendorong perusahaan dalam mengimplementasikan aspek-aspek <em>Environmental, Social, <\/em>and <em>Governance <\/em>(ESG) dalam mewujudkan pembangunan berkelanjutan atau <em>Sustainable Development Goals <\/em>(SDGs).<\/p>\n<p><!-- AI CONTENT END 2 --><\/p>\n<p>                            <!-- [ICONOMICS] --><\/p><\/div>\n<p><br \/>\n<br \/><a href=\"https:\/\/www.theiconomics.com\/brand-equity\/united-tractors-peroleh-sertifikasi-renewable-energy-dari-pln\/\">Source link <\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>PT United Tractors Tbk (UT) telah berhasil mendapatkan Renewable Energy Certificate (REC) di sepanjang 2023 dari PT Perusahaan Listrik Negara<\/p>\n","protected":false},"author":2,"featured_media":3529,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[2,13],"tags":[],"class_list":["post-3528","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-business","category-news"],"magazineBlocksPostFeaturedMedia":{"thumbnail":"https:\/\/portalutama.net\/wp-content\/uploads\/2024\/07\/Serah-terima-Renewable-Energy-Certificate-dari-Perusahaan-Listrik-Negara-PLN-kepada-United-Tractors-Manado-150x150.png","medium":"https:\/\/portalutama.net\/wp-content\/uploads\/2024\/07\/Serah-terima-Renewable-Energy-Certificate-dari-Perusahaan-Listrik-Negara-PLN-kepada-United-Tractors-Manado-300x175.png","medium_large":"https:\/\/portalutama.net\/wp-content\/uploads\/2024\/07\/Serah-terima-Renewable-Energy-Certificate-dari-Perusahaan-Listrik-Negara-PLN-kepada-United-Tractors-Manado.png","large":"https:\/\/portalutama.net\/wp-content\/uploads\/2024\/07\/Serah-terima-Renewable-Energy-Certificate-dari-Perusahaan-Listrik-Negara-PLN-kepada-United-Tractors-Manado.png","1536x1536":"https:\/\/portalutama.net\/wp-content\/uploads\/2024\/07\/Serah-terima-Renewable-Energy-Certificate-dari-Perusahaan-Listrik-Negara-PLN-kepada-United-Tractors-Manado.png","2048x2048":"https:\/\/portalutama.net\/wp-content\/uploads\/2024\/07\/Serah-terima-Renewable-Energy-Certificate-dari-Perusahaan-Listrik-Negara-PLN-kepada-United-Tractors-Manado.png","colormag-highlighted-post":"https:\/\/portalutama.net\/wp-content\/uploads\/2024\/07\/Serah-terima-Renewable-Energy-Certificate-dari-Perusahaan-Listrik-Negara-PLN-kepada-United-Tractors-Manado-392x272.png","colormag-featured-post-medium":"https:\/\/portalutama.net\/wp-content\/uploads\/2024\/07\/Serah-terima-Renewable-Energy-Certificate-dari-Perusahaan-Listrik-Negara-PLN-kepada-United-Tractors-Manado-390x205.png","colormag-featured-post-small":"https:\/\/portalutama.net\/wp-content\/uploads\/2024\/07\/Serah-terima-Renewable-Energy-Certificate-dari-Perusahaan-Listrik-Negara-PLN-kepada-United-Tractors-Manado-130x90.png","colormag-featured-image":"https:\/\/portalutama.net\/wp-content\/uploads\/2024\/07\/Serah-terima-Renewable-Energy-Certificate-dari-Perusahaan-Listrik-Negara-PLN-kepada-United-Tractors-Manado.png","colormag-default-news":"https:\/\/portalutama.net\/wp-content\/uploads\/2024\/07\/Serah-terima-Renewable-Energy-Certificate-dari-Perusahaan-Listrik-Negara-PLN-kepada-United-Tractors-Manado-150x150.png","colormag-featured-image-large":"https:\/\/portalutama.net\/wp-content\/uploads\/2024\/07\/Serah-terima-Renewable-Energy-Certificate-dari-Perusahaan-Listrik-Negara-PLN-kepada-United-Tractors-Manado.png"},"magazineBlocksPostAuthor":{"name":"Redaksi","avatar":"https:\/\/secure.gravatar.com\/avatar\/b7471c990eaf3bbb9eb8588768e7506fe3240b053ad738bae905f94f0ebd1eb0?s=96&d=mm&r=g"},"magazineBlocksPostCommentsNumber":"0","magazineBlocksPostExcerpt":"PT United Tractors Tbk (UT) telah berhasil mendapatkan Renewable Energy Certificate (REC) di sepanjang 2023 dari PT Perusahaan Listrik Negara","magazineBlocksPostCategories":["Business","News"],"magazine_blocks_featured_image_url":{"full":["https:\/\/portalutama.net\/wp-content\/uploads\/2024\/07\/Serah-terima-Renewable-Energy-Certificate-dari-Perusahaan-Listrik-Negara-PLN-kepada-United-Tractors-Manado.png",616,360,false],"medium":["https:\/\/portalutama.net\/wp-content\/uploads\/2024\/07\/Serah-terima-Renewable-Energy-Certificate-dari-Perusahaan-Listrik-Negara-PLN-kepada-United-Tractors-Manado-300x175.png",300,175,true],"thumbnail":["https:\/\/portalutama.net\/wp-content\/uploads\/2024\/07\/Serah-terima-Renewable-Energy-Certificate-dari-Perusahaan-Listrik-Negara-PLN-kepada-United-Tractors-Manado-150x150.png",150,150,true]},"magazine_blocks_author":{"display_name":"Redaksi","author_link":"https:\/\/portalutama.net\/index.php\/author\/neno\/"},"magazine_blocks_comment":0,"magazine_blocks_author_image":"https:\/\/secure.gravatar.com\/avatar\/b7471c990eaf3bbb9eb8588768e7506fe3240b053ad738bae905f94f0ebd1eb0?s=96&d=mm&r=g","magazine_blocks_category":"<a href=\"https:\/\/portalutama.net\/index.php\/category\/business\/\" rel=\"category tag\">Business<\/a> <a href=\"https:\/\/portalutama.net\/index.php\/category\/news\/\" rel=\"category tag\">News<\/a>","_links":{"self":[{"href":"https:\/\/portalutama.net\/index.php\/wp-json\/wp\/v2\/posts\/3528","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/portalutama.net\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/portalutama.net\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/portalutama.net\/index.php\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/portalutama.net\/index.php\/wp-json\/wp\/v2\/comments?post=3528"}],"version-history":[{"count":0,"href":"https:\/\/portalutama.net\/index.php\/wp-json\/wp\/v2\/posts\/3528\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/portalutama.net\/index.php\/wp-json\/wp\/v2\/media\/3529"}],"wp:attachment":[{"href":"https:\/\/portalutama.net\/index.php\/wp-json\/wp\/v2\/media?parent=3528"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/portalutama.net\/index.php\/wp-json\/wp\/v2\/categories?post=3528"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/portalutama.net\/index.php\/wp-json\/wp\/v2\/tags?post=3528"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}